Saturday 31 October 2009

Colwyn Bay Scenic Structures

A sleeper and "I" section fence for the rear of the coal yard, which is almost 3 feet long.


The green shed, still requiring a green wash and window frames.


The layers are slowly being built up on the main goods shed.


The pictures above are pretty much self explanatory, just a quick refresh to show the overall progress of the project.



Tuesday 20 October 2009

3-way Asymmetric Turnout

My previous RH turnout along side the new 3-way.

A mock up to test the final track position.


The wheels of progress continue to turn on Colwyn Bay. Track work is ready to be glued into it's final place, Tortoise motors have been purchased and a shiny new DCC system is on it's way. New plans for a fiddle yard have been drawn up and scenics are just over the horizon.


Sunday 4 October 2009

On the Right Track

RH A6 Turnout from Easitrac Components

After another career move, the dust has once again settled and progress continues. I have finally started work on my turnouts, I can not praise these products highly enough! The results are consistent and crisp, thanks to some very clever jigs provided. Future updates will be along shortly as the 3 way point progresses.